Maya Enerji Yatırımları A.Ş. (Maya Energy
Investments Inc.) is a Brightwell Holdings
B.V. investment in the energy sector. Maya
Enerji, which was established in August of
2006, sold 70% of its shares to Borusan
Enerji in October of 2007. The partners will
both be building electric power plants for
energy production and conducting R&D on new
renewable energy sources.
Maya Enerji took over the Aksu and Yedigol
Hydroelectric Power Plant’s (50 MW installed
power production and 166 GW total production
capacity) 49-year operating rights from
Gozutok Elektrik Uretim Inc. after EMRA (EPDK
- Energy Market Relating Authority) approval
in August of 2006. It is projected that
these two power plants will be in service at
the end of 2009 with a total investment of
65 million US dollars.
Maya Enerji earned the right to acquire the
49 year operating rights for the Ordu-Fatsa
Hydroelectric Power Plant Project (51 MW
installed power production and 126 GW total
production capacity) at the SWA (DSI - State
Waterworks Authority) Contribution Share Bid
Meeting by offering the bid with the highest
contribution share, on June 13, 2007. SWA
and EMRA approvals are expected related to
the turnover. The approximate total
investment for these projects will be 80
million US dollars.
Similarly, in September 2007, the 49-year
operating rights for the Cayasan
Hydroelectric Power Plant, with 17 MW of
installed power and a total power production
capacity of 84 GWh, were purchased along
with the Van Electric Production Industry
and Commerce Ltd. company (Van Elektrik
Üretim Sanayii ve Ticaret Ltd.Şti.). The
relevant EMRA approval is expected. The
total investment for these projects will be
approximately 32 million US dollars.
In December 2007, Maya Enerji earned the
right to acquire the 49 year operating
rights for the Kaletepe Hydroelectric Power
Plant Project in Tunceli (60 MW installed
power production and 215 GWh total
production capacity) at the SWA Contribution
Share Bid Meeting by offering the bid with
the highest contribution share.
In April 2008, Maya Enerji obtained the
right to acquire the 49 year operating
rights for the Alara Group Hydroelectric
Power Plants Project in Antalya (187 MW
installed power production and 622 GWh total
production capacity) at the SWA Contribution
Share Bid Meeting by offering the bid with
the highest contribution share.
In June 2008, Maya Enerji earned the right to
acquire the 49 year operating rights for the
Bozkaya Hydroelectric Power Plant Project in
Tunceli (30 MW installed power production
and 109 GWh total production capacity) at
the SWA Contribution Share Bid Meeting by
offering the bid with the highest
contribution share.
In addition to the hydroelectric power plant
investments, there are plans to add wind and
coal power plants to the investment
portfolio. Acting on this vision,
applications for licenses for 3 Wind Power
Plants with an installed power production
capacity of 160 MW were made in November of
2007.